Writing specs
Page count: | 5 pages |
Quantity of locations: | No restrictions — but, due to the pandemic, keeping the quantity of locations small is advised (one physical location per shooting day) |
Quantity of characters: | No restrictions |
Children: | Yes |
Animals: | Yes |
Weapons: | Yes |
Sexual intimacy: | Yes – but an intimacy coordinator may be required for certain scenes |
COVID restrictions: | No blanket restrictions on writing, but be mindful of tips for writing during a pandemic and a COVID script breakdown will be required on an early draft to anticipate safety concerns. |
Production specs
Locations per day: | 1 location – no company moves in the middle of a production day |
Distance to location: | Must shoot inside the studio zone |
Shooting days: | 2 days |
Pick-up days: | No |
Length of workday: | 12 hours, plus an hour for lunch |
Call time: | No call times before 6AM, with a minimum turnaround of 10 hours |
Company wrap: | No later than 12AM |
Night shoots: | No |
FIST agreement: | Yes |
COVID protocols: | Yes |
Data allocation
Final page count: | 5 pages |
Shooting days: | 2 days |
Pages per day: | 2 4/8 pages |
Shooting ratio: | 20:1 |
Data rate: | 2.6 GB/minute |
Max. data per page: | 52 GB |
Max. data per day: | 130 GB |
Max. dailies per day: | 50 minutes |
Capture settings
Frame rate: | 24.000 fps |
Record file format: | ProRes 4444 HQ |
Resolution: | 2K (2048×1080) |
Video codec: | ProRes 4444 HQ |
Baked-in settings: | All image settings (Rec. 709 / SDR) |
Mode: | IPP2 |
Output color space: | Rec. 709 |
Output tone map: | Medium Contrast |
Highlight roll-off: | Medium |
Picture Edit specs
Pic edit location: | Post Hall |
Pic edit software: | Media Composer |
Pic edit days: | 7 days |
Max. story content: | 5:30 |
Max. credits: | 1:08 |
Max. TRT: | 6:38 |
Sound specs
Sound location: | Post Hall |
Sound software: | ProTools |
Sound design days: | 6 days |
Sound mix days: | 0.5 days |
Visual Effects specs
VFX restrictions: | Quick, simple visual effects only, such as easy screen comps or muzzle flashes. |
VFX days: | No assigned days. All visual effects work needs to be completed around other work, so assume only having a day or two at most. |