Crew Drills (BTH) – Fall 2020

The purpose of the crew drills is to practice working in each of the crew positions. Don’t get too caught up on trying to make the “perfect” scene. Keep it really simple. BFA3 department heads mentor those in their department, as follows:

  • 1st AD mentors both 2nd ADs
  • 1st AC mentors both 2nd ACs
  • Key Grip mentors both BBGs

Food will not be provided, so make sure you plan accordingly. You have a 1-hour lunch break, so either bring your own lunch or plan to go out nearby. Just make sure you’re back in time.

Crew drills will take place on the set in Stage A.

Crewing

BFA3 will complete the Crew Drill grid together as a class. There are 8 BFA3 positions for each drill. This will give each of you an opportunity to mentor the BFA2 and get to know them better. This also gives you a chance to get your hands on the gear again to reignite that muscle memory.

BFA2 will work the 3 positions (2D, 2C, BG) in pairs. One of the 2Ds and one of the 2Cs will start off as Actors for the first half of the drill. Then they will swap, and the other 2D & 2C will be the Actors. The BGs will remain working in pairs during the entire drill.

Production

The production will have 2.5 hours to unload the van, block, rehearse, build, shoot, and wrap.

Plan on having 6 total setups. Once you have shot the first 3 setups with the first 2D/2C Actors, swap them with the other 2D/2C Actors. Have the Director modify the blocking, the 2C lay down new marks, and then reshoot the scene with the other 3 setups.

  • 1st New Deal 0:10
  • Camera on set 0:30
  • Lighting complete 0:40
  • Start Shooting 0:45
  • Swap Actors with other 2D/2C pair 1:10
  • 2nd New Deal 1:20
  • Camera Wrap 2:00
  • Company Wrap 2:30

Crew responsibilities

[/su_spoiler]
Director

Before the Drill

  • You will use a scene (or part of a scene) from your BTH script for this crew drill. The script must meet the following criteria (make up a crew drill version if necessary):
    • Must be no less than 1 full page, and no more than 1 4/8 pages in length
    • Must only have 2 characters (no more, no less)
    • Must have dialog (so the Sound Mixer can practice recording it)
    • Keep it simple (no stunts, close proximity, weapons, complicated SFX, etc.)
  • The cast will consist of one of the 2D and 2C pairs, then they’ll swap half way through.
  • Discuss the shot design with the DP.

During the Drill

  • At the beginning of the shift, briefly block with the Actors on the set (keep it really simple).
  • During the New Deal, have the Actors demonstrate the blocking for the crew.
  • Direct the Actors in the scene.
  • Once you have shot the first 3 setups with the first 2D/2C Actors, swap them with the other 2D/2C Actors. Modify the blocking with them, then reshoot the scene with the other 3 setups.
Production Designer

Before the Drill

  • Discuss the production design with the Director (keep it simple).
  • Acquire props, wardrobe, etc (only if absolutely necessary).

During the Drill

  • Dress the set, provide props & wardrobe only if necessary.
Director of Photography

Before the Drill

  • Discuss the shot design with the Director.
  • Create a simple Setup Schedule with 3 setups for each of the 2D/2C Actor pairs, for a total of 6 setups. For example:
    • 1st 2D/2C Actor Pair: 3 setups (1 master + 2 singles)
    • 2nd 2D/2C Actor Pair: 3 setups (1 master + 2 singles)

During the Drill

  • Communicate the setups to the crew.
  • Manage the Camera, Grip & Electric Departments.
  • Once you have shot the first 3 setups with the first 2D/2C Actors, swap them with the other 2D/2C Actors. Have the Director modify the blocking, the 2C lay down new marks, and then reshoot the scene with the other 3 setups.
1st Assistant Director

Before the Drill

  • Get a copy of the Setup Schedule from the DP.

During the Drill

  • At call time, have a Safety Meeting with the entire crew to communicate an emergency plan, location hazards and any production safety concerns. Complete the Safety Meeting Report
  • Get the DR to quickly show the Actors the blocking, while the 2C lays down marks, then call a New Deal.
  • Run the set, making sure the crew is working safely and efficiently.
  • Keep track of your time using the Setup Schedule.
  • Once you have shot the first 3 setups with the first 2D/2C Actors, swap them with the other 2D/2C Actors. Have the Director modify the blocking, the 2C lay down new marks, then call a New Deal
  • Reshoot the scene with the remaining 3 setups.
2nd Assistant Director

During the Drill

  • At the beginning of the shift:
    • Take forehead temperature of each crew member.
    • Have crew sign in using the iPad timeclock.
    • Hand out walkies to department heads.
  • During the shift:
    • Remain in Green Room with the Actors, except to escort them to/from set at 1st AD’s request.
    • During a setup, remain outside the stage doors to make sure no one enters during a take.
  • At the end of the shift:
    • Complete the Performers Production Time Report. Have the Actors sign it.
    • Have crew sign out using the iPad timeclock.
    • Collect walkies and put them back on charger.
All Other BTL

During the Drill

  • Work with BFA3 mentors in your assigned positions.